A sports pitch above ground, a shelter underground. This is what public infrastructure designed to cope with emergency situations might look like. POZBRUK has announced the development of prefabricated protective structures for local authorities and the armed forces. The company intends to be responsible for their design, production and construction, and is collaborating with Poznań University of Technology on research work.
Shelters made from prefabricated elements
Towards the end of this summer, POZBRUK outlined a new direction for its business. As part of this, it presented prefabricated shelters and other structures designed to protect the population and infrastructure. These will be based on concrete components manufactured at the plant and then assembled at the final site. This construction method facilitates the standardisation of production and quality control of individual components. According to the company, it can also reduce lead times, which is important when constructing a larger number of structures. The offering will be aimed primarily at local authorities and the armed forces. The manufacturer intends to draw on the expertise developed over more than 40 years of operation in the concrete industry. Today, it operates five production plants, its own aggregate quarries and a team of engineers.
A sports pitch above ground, protection underground
One of the examples presented by the company is the installation of shelters beneath sports pitches. An underground shelter can thus be built on public land, the surface of which continues to be used by residents for everyday recreational activities. POZBRUK’s materials also feature a combination of car park and shelter functions. This approach is referred to as ‘dual use’, meaning the dual purpose of the infrastructure. For architects and local authorities, this means that the protective function must be taken into account right from the design stage of a project. The company reports that the first shelters are currently under construction.

Poznań University of Technology and POZBRUK
The scientific backbone of the project is to be a collaboration with Poznań University of Technology. In March 2026, POZBRUK signed an agreement with the university concerning research and development work, including the design and analysis of collective protection structures. The work also covers ground reinforcement, infrastructure protection and specialist prefabricated components capable of withstanding increased loads. According to the manufacturer, the research being carried out focuses on the resistance of protective structures to extreme impacts, including the effects of explosives and electromagnetic pulses (EMP).
Tests at the POZBRUK mine
When developing such facilities, it is essential to be able to test the structures under conditions close to real-world scenarios. POZBRUK points to its own mine in Pieńsk, which can serve as a test site. It also cites the proximity of the test site in Biedrusko, near Poznań, as an asset to its research facilities.
Prefabrication as a means of faster construction
Bartosz Nowicki, POZBRUK’s Chief Operating Officer, highlights the growing demand for infrastructure that can be delivered quickly and consistently, whilst maintaining high safety standards. Prefabrication is intended to facilitate this process, from the design and production of components through to the completion of the structure.
From the perspective of urban space, the idea of utilising land already designated for public functions is particularly interesting. A shelter beneath a football pitch allows us to think of protecting residents as part of everyday infrastructure. However, the practical value of these proposals will depend on the parameters of specific projects, their availability and construction costs.
Source: POZBRUK
See also: Interesting facts | Architecture in Poland| City | Poznań



