Construction of the new boathouse in Gdynia is drawing ever closer. At the end of September this year, 11 tenders were opened for the construction of the sailing centre and club facilities. The cheapest bid stands at 29.49 million zlotys and falls within the city’s budget. Three buildings are to be erected between Topolowa Avenue and the marina. However, the project has been met with reservations regarding the convenience of the new facilities for sailors.
New boathouse in Gdynia and 11 bids
Eleven bids were submitted in the tender, with prices ranging from approximately 29.5 to 53.5 million zlotys. The cheapest bid was submitted by Przembud Gdańsk, and the most expensive by ZAB-BUD. The Gdynia Sports Centre has allocated over 40 million zlotys to the project and is currently evaluating the contractors’ proposals. The project has received nearly PLN 11 million in funding from the Ministry of Sport and Tourism as an Olympic Sailing Centre, designed to serve the marina and provide training for children, young people and the national team.
The temporary building has been in use since 2000
The current harbour master’s office is a small, single-storey building dating from 2000, erected as a temporary facility for the marina. However, this makeshift structure has stood for over a quarter of a century, and the available space no longer meets the needs of sailors and sailing schools. The construction of a new building was announced in 2024 by the then Mayor of Gdynia, Wojciech Szczurek. The next step was taken on 27 August 2025, when the City Council unanimously adopted the local plan enabling the development. This was preceded by consultations, during which 18 out of 23 comments submitted were taken into account.

Architecture inspired by Gdynia
The new complex is to consist of three buildings with two and three storeys above ground, offering approximately 3,500 square metres of usable floor space. The visualisations show white façades, flat roofs, large windows, geometric forms and rounded corners, reminiscent of Gdynia’s famous modernist architecture. The boathouse will house the marina’s office and ticket office, hangars, toilets, a laundry, as well as training and conference rooms. The other two buildings will accommodate facilities for clubs and sailing schools, including equipment stores and changing rooms. Pedestrian walkways, parking spaces, green spaces and lighting will be created around the complex, whilst the local plan has also designated an area for a public square opening out towards the sea. PIG Architekci are responsible for the architectural concept and visualisations of the boathouse, whilst the functional and operational programme was drawn up by Konrad Dawidowicz.
Criticism of the project and Szymankiewicz’s vision
Not everyone is in favour of this concept. The website olimpijskiecentrumzeglarskie.pl sets out concerns regarding the functionality of the complex, where we can also view an alternative vision by architect Michał Szymankiewicz. The criticism mainly concerns access to the hangars from the sides and the rear, which, according to the author, lengthens the time taken to transport boats and makes it difficult to manoeuvre vehicles with trailers. His proposal is for a wider building with more gates facing the water, a working area in front of the hangars, and administrative offices on the upper floor or to the side. The architect also proposes a wide slipway opposite the building and more convenient areas for unfurling sails. This is a clear voice articulating the needs of sailors. Will it prove successful? We shall see.

The expertise of an architect-sailor
Michał Szymankiewicz assesses the design from the perspective of an architect and a sailor with regatta experience. The founder of Aren Architects holds full architectural design qualifications, and his portfolio includes, amongst others, masterplans for the Puck marina, the Dźwirzyno marina and the Old Port in Poznań. He has also drawn up plans for the marina in Frombork. Many years ago, whilst completing his studies, he wrote a dissertation which stands a chance of being realised if Poland were to host the Olympic Games. The title of this project is “Olympic Sailing Training Centre in Cetniewo: a floating marina utilising wave energy”. This experience provides him with the professional and practical grounding to assess the layout of hangars, boat transport and the convenience of the facilities for athletes.
New Boatswain’s Office in Gdynia – two years for completion
The tender for the construction of the new Gdynia boathouse was announced on 17 July 2026 on a “design and build” basis. The selected company will be responsible for the documentation, obtaining the necessary approvals, construction and the occupation permit. A period of 730 days, or approximately two years, has been set for the completion of the contract – one year each for design and construction work.
Source: gdyniasport.pl
See also: Gdynia|City|Urban planning|Modernism|Interesting facts|whiteMAD on Instagram



